Di masa waktu konsolidasi tanah yang diperkirakan selama 4 bulan, kami akan melaksanakan Pekerjaan Precast Secondary Drain Type 25 dengan menerbitkan metode kerja
In the period of consolidation of the soil that is estimated for 4 months, we will carry out the work of Precast Secondary Drain Type 25 by publishing working methods
In the period of consolidation of land is estimated for 4 months, we will carry out the job Precast Secondary Drain Type 25 by publishing working methods