On Wednesday 7 sept 2016 around 18:00 pm there is a leak in the roof of building Pacific Place resulting area restaurant PAUL Bakery flooded in and close to 2 hours operational from 18.00 until 20.00.
The leak has been long we have previously reported to the building, and time we immediately reported the incident to the Pacific Place building tenant relations. The water out of the roof of building that is located on the roof PAUL Bakery and into the area PAUL.
Here's the picture position a leak on the roof PAUL:
the water out of the slit lamp building,
a water leak resulted into the whole area of the glass house and many of
the guests disturbed over this incident. We also get complaints from guests on uncomfortable with this event and many guests were leaving Paul Bakery after they complete their payments.
The water pouring down to the area of glass house, if not sooner we follow will lead our floor was broken and could lead to a short circuit on lights.
Over this incident we lost sales of Rp 20,000,000, - in 2 hours and to display the sale of our remaining 16% until we close operational today,
with this incident I'm assisted by the tenant relations by means of vacuum water so fast in the clear in the area and in the area of the roof,
to anticipate events do not happen again then the tenant relations close the roof PAUL Bakery with tarps, with which they directly do damage on the roof of Pacific Place.
the following graphics:
Hereby I make the minutes on what happened on september 07, 2016.
For your attention and cooperation I thank you.
Regards,
Malvin D
Sedang diterjemahkan, harap tunggu..
