after the pipeline is ready inserted into the casing 02 excavator slowly moving towards the road and 03 excavators pull chains or slings are linked in the pipe 01 utama.sementara excavator preserve the stability of the main pipe being inserted into the casing.
Sedang diterjemahkan, harap tunggu..
