On Wednesday 7th sept 2016 around 6.00 PM GMT leaks in the roof of building Pacific Place which resulted in PAUL Bakery restaurant area flooded in and close to 2 hours operational from 18.00 until 20.00. The leak was a long report, we already reported to the maintenance building Pacific Place. The water coming out of the roof of the building that sits on top of the roof of the PAUL Bakery and his belonging to the late PAUL area, resulting in guest on maxim area disturbed and immediately leaving the PAUL Bakery after they complete the payment.We are also in the complaint from guest bebebrapa us that they feel uncomfortable over the incident.
Sedang diterjemahkan, harap tunggu..
