The following documents will be the basis of the execution of engineering:
1. Mandatory, Regulation / Indonesian law,
2. Indonesian government requirements (Oil and Gas, DEPNAKER, etc),
3. Code and the International standard,
4. Company specifications and procedures
5. Deliverable FEED Company (AFD status)
Except as specific or agreed with the company, the latest edition of the codes and standards used will determine Works. When there is a conflict, inconsistency or ambiguity between the codes and standards with the specifications of the Company, which will be used is the most stringent.
Sedang diterjemahkan, harap tunggu..