siapkan 2 lembar plat besi untuk menutup permukaan galian jalan yang ditimbun dengan tujuan agar bisa langsung dilewati kendaran baik roda 2 maupun roda 4.
prepare the 2 sheets of iron plates to cover the surface of the quarry roads are deposited with the aim to direct the vehicle to traverse wheel 2 wheel or 4.
prepare two sheets of iron plate to cover the surface of the road excavation backfilled with the aim that the vehicle can immediately passed both 2 wheel and 4 wheel.