Sunday, July 03, 2016 at 1:15 pm at the location of 4M-64A consists of 3 well. Status rig operating ACS # 15 will be moving to 4M well-64A. When Dozer (PT BKL) do dress up locations 4M-64A (new location) Dozer did dress up around the panel box, when the dozer moving forward to tidy up the land, but the dozer blade on underground cables in a panel box, resulting in under ground cable broke, None No casualties or injuries in this incident.
Sedang diterjemahkan, harap tunggu..
