Excavation of the OB on the opening a new PIT, should begin from the coal crop Guide (limit boundary plans Low Wall)• If found Coal Crop that make sure has done the installation tape Crop Line coal.• If there is a discrepancy between the actual Crop Coal from the plan then it should immediately coordination and communication with the supervisor, survey and mine plan for those changes.• To maintain the quality of the coal is then behind the Crop Line should be constructed drainage ditches along the crop/line (approximately 1 meter behind the cropline)