BRIEF RESUME
DEVELOPMENT PROJECT LINE II
TERMINAL Lamong Bay
1. Background
Port of Tanjung Perak is the biggest port into two in Indonesia and has a very important role to facilitate system Logistics in Eastern Indonesia.
Production of the Port of Tanjung Perak over the last 5 years show significant improvement, so that in the long run would require additional enormous capacity for managing the flow of containers will reach about 10 million TEUs in 2030.
Based on these conditions and in accordance with the Port Master Plan (RIP) Tanjung Perak Area, PT. Pelabuhan Indonesia III (Persero) set up: one Lamong Bay Container Terminal.
At Lamong Bay Terminal Development Project was divided into Phase 2, where. at each stage consists of two lines.
- For the First Phase has been completed and operated:
o Line I:
Pier International 500-meter
Domestic dock along 450 meters
Trestle along 970 meters
Stacking Container Fields area of 15.86 hectares.
Courses Dry Bulk buildup area of 8 hectares.
o line II::
Office Building
Transit Fields area of 7 ha
Causeway along the 1,900 meter
Interstate Bridge along 800 meters.
- for the second phase of the planned concept Terminal Development Lamong bay area of 386.12 hectares, namely:
o Terminal line I (covering an area of 140 ha) as the Terminal Operations Zone Langsung.untuk activities Stevedoring, Storage and Receiving & Delivery.
o Terminal line II (covering an area of 246.12 ha) as the Terminal Operations Direct Support Zone for distribution activities and the consolidation of goods (Depo containers) as well as logistics services that support the operation of container Terminal and Bulk Dry ..
2. Space Utilization Permit
In accordance with the mandate of the Governor of East Java through Space Utilization Permit (IPR) published by the Investment Board of East Java Province Number: P2T / 30 / 01:01 / 01 / X / 2012 dated October 10, 2012 covering an area of 386.12 hectares, then to Terminal Zone Development for the Gulf Terminal Operations Support Lamong (on line II), PT. Pelabuhan Indonesia III (PT Pelindo III) should work with the Regional Owned Enterprises (enterprises).
Following this, PT. Pelindo III.telah cooperation development with a strategic business partner recommended by the Governor of East Java in most Zona Terminal in Line II area of 145.2 ha, including for the development of the container depot in order to reduce dweling time in the Zone Terminal Line I
's partners businesses are PT. Together Building Java (PT. BMJ)
3. PT. Together Building Java (PT. BMJ)
Office: Jl. Kartini No. 63-65 Surabaya
Deed of Establishment: No. 2 On July 5, 2012
Notary Ny. Erna Anggraini Hutabarat SH.MSi.
PT. Together Building a Java Regional Owned East Java province, which is controlled by:
- PT Jatim Graha Utama (PT JGU) - 15% shareholding
- PT Artha Karya Urip Santosa (PT. Akus) - 43% shareholding
- PT. Maritime Transline (PT. ML) - 42% ownership
of PT. Pelindo III has done a Cooperation Agreement with PT. Together Building Java (PT. BMJ) on Reclamation Upper Room and Land Utilization As Matang Covering 145.2 ha for the Interest Development and Multipurpose Terminal Zone Management Logistics Lamong Bay on October 3, 2014 with Treaty No. HK.0501 / 1066 / P.III -2014 with the validity period of the Agreement for 30 (thirty) years since-tangninya signed this Agreement.
And of the area can be done in cooperation with third parties or private investors covering + 116.16 Ha with the knowledge of the PT. Pelindo III.
Cooperation Agreement concessions include:
- Operating Pier
- Warehouse Management and Field buildup
- As well as other activities on Line I and Line II as a single concession with a unity of rights and obligations, including the status of land reclaimed both on Line I and Line II which will have the status HGB above ground HPL Port Authority and the period of the concession for the operation of the terminal that includes line I and line II with the scheme Build Operate and Transfer (BOT).
EIA Project Terminal Development Lamong bay has been completed and compiled by Legal Yang apply.
4. Cooperation with Investors
In addition to the land area of 116.16 hectares of the above, land that can be done in cooperation with investors, with PT Pelindo III .. is on (see Appendix picture):
a. - In the Zone Dry Bulk Terminal Supporting PAI area of 35.60 Ha
- In Zone Facility Road Interchange area: 25.69 Ha ..
Total area of the land is: 61.69 hectares, or an area + 60 Ha.
Of Total Size , which can be done in cooperation with private investors covering + 54 Ha.
b. At PAI Zone Support Container Terminal area + 50 Ha.
From the area, which can be done in cooperation with private investors covering + 45 Ha.
5. Conclusion
a. From the description above, which can be done in cooperation with private investors, namely area: 116 ha + 54 + 45 Ha Ha Ha = 215.
B. PT. Pelindo III proposes cooperation with the concession to a third party for 98 (ninety eight) years for the construction and development of Terminal Lamong bay.
C. Given the development of Phase I Terminal Lamong Bay has operated and to prevent idle Terminal development investment, it is expected to accelerate the realization of cooperation Lamong Bay Terminal concession,
Surabaya, June 1, 2015 II