Responding to a letter ref: 0237 / KIK-DC / Infrastructure Ph 1A-2/04/16, April 25th 2016, the explanation with a very complete the revisions image infra phase 1A-2. Can we say with respect, that the revision of drawings submitted by the parties owner PT KIK, "take time" for us "learn and work" into the picture (shop drawings) as foreseen PT KIK with basic reference data, analysis table resumes monitoring settlement that was sent to us on the day "Friday 22th April 2016" ,