Purpose: To review the results of the initial survey has been conducted to test the business feasibility and accuracy of the MHP development plan Citarik River 2 with a capacity of 2 x 3000 kW plan (2 x 3 MW) the goal: Get Assurances as to the business feasibility of the development of MHP Citarik river with a capacity of 2 x 3000 kW (2 x 3 MW) Get the survey results are accurate and detailed identification of the elevation, as well as collecting secondary data is concerning hydrology at the construction site
Sedang diterjemahkan, harap tunggu..
