In addition to using the test sequence to get the RII factors influence decisions Just In Time, test the Confidence intervals are also made to support and amplify the results of research data obtained from test rankings RII. In this research a discussion conducted only against the variables included in the first stage. The variables in the first rank is a variable that is very influential and is assessed in accordance with the conditions of use of prefabricated components of existing work on the construction project by the method Just In Time. Then it can be known the first rank is the simplification of work processes to minimize labor with use of fabrication technologies (X23), Reduce a capacity excess transport with the precision of a schedule (X13), a detailed scope of work and complete defined to control the cost of project (X17), and take into account the hours of work tools used (X30).
Sedang diterjemahkan, harap tunggu..