activities running boiler and Turbine # 1 is running, at 09.00 on the screen of the monitor there are disturbances observed CCR electrical system on one of the panels. NWPower electrical officer trying to find the source of the problem, and finally found at about 09.30 there control panel electrical box going konsleting, and two box-panel unit networks within visible komatsugawa
Sedang diterjemahkan, harap tunggu..
