11. Untuk item 1, harus bisa synchronize dengan existing genset yang ada di lapangan SPU-B. Apabila barang tidak sinkron maka barang yang dikirim tidak dapat diterima
11. for item 1, should be able to synchronize with the existing genset that is in the field of B-SPU. If the goods are not in sync, then the goods sent are not acceptable
11. For item 1, must be able to synchronize with the existing generator on the ground SPU-B. If the goods are not in sync then shipped goods can not be accepted