The following are some things that need to be done.
1. Change blackbox devices become standard industrial switches IE3000 IT network PTVI
2. Replace the cable into the cable drop wire Fiber Optick
3. JB dressing on the side DOS # 2
Sedang diterjemahkan, harap tunggu..