HUMASPROTOKOL, Sidoarjo.-want to know directly the development of construction projects that are being or have been carried out, Sidoarjo Regent h. Saiful Ilah SH, m. Hum down directly spaciousness. By riding the motorcycle, seven development projects together with the head of Department disambanginya Sidoarjo, Saturday (22/11). The first location was awarding Sheetpile reviewed on the existing Pagerwojo-Pucang completed work. Down from the vehicle wheels in Java, Sidoarjo Regent h. Saiful Ilah immediately see the vertical walls that have been installed to hold the soil. Sheetpile erection was done so that the river is Pagerwojo-Pucang Highway suffered no avalanche. Head of Department of public works Bina Marga Sidoarjo Sigit Setyawan review use of the number one in the Sidoarjo. Content viewed workmanship Sheetpile Pucang-Pagerwojo, groups of heading Pool ' a ' water of the spring is GORSidoarjo. The swimming pool is undergoing renovation has been completed the work. Sidoarjo Regent h. Saiful Ilah who accompanied public works Department Chief Cipta Karya and Spatial Sidoarjo Agoes Budi Tjahjono giving their time driving around looking at the facilities of the swimming dikolam. Finished reviewing the second location, Sidoarjo Regent to the Social Service Office development and labor Sidoarjo still in workmanship. A total renovation of the offices located in the highway of the Teak is almost finished. It could be said already 90% of the development work that has been done. Further groups of moving to see the Pucang avour in the village of Cemengkalang-Sidoarjo. Sidoarjo Regent h. Saiful Ilah, who was accompanied by head of Department of public works Fatkhur Watering Loveland wants to see directly the removal of river walk normally. The intended development project next is a workmanship Frontage Road Buduran. The development of the alternative road construction reviewed Sidoarjo Regent h. Saiful Ilah still in leveling the ground. Expected with the completion of the construction of the road which is located beside the Avian paint manufacturer will be able to parse the congestion. Development projects to the other six road construction paving is the village of Sawohan-Buduran. Pavingisasi road pertambakkan are expected to be able to smoothen the wheels of the economy pond farmers residing in the village. Site last reviewed is a multipurpose building in the village of Bluru South of Sidoarjo. Construction of the multipurpose building that will be named the Community Centre of Sidoarjo later can be used for various activities of Sidoarjo community. Activities such as exhibitions and wedding receptions. After the review, Sidoarjo Regent h. Saiful Ilah hoping development projects exist in Sidoarjo soon be resolved. In addition to fast in order to be utilized, it wants to at the end of his term there is an unfinished construction work. "The end of my term, 2015 should be done all that has been targeted," he said.
Sedang diterjemahkan, harap tunggu..