After the meeting, we have a conclusionfor fountains, a minimum of 3 weeks in the drain, then finishing. that is, after 2 weeks the product in set, then in the texture, and pat dry in 5-6 days, and then in the paint. print products. using cement in the mix with TG 300 (polymer)(need a cofirm with you)
Sedang diterjemahkan, harap tunggu..
