After the pipeline is ready to put into the casing then excavator 02 moving slowly toward the street, excavator 03 interesting chain or sling which is linked on the main pipeline. While excavators 01 keep the stability of main pipe being inserted into the casing.
Sedang diterjemahkan, harap tunggu..
