APPLICATION PHASE PHASE SNI
Stage stages as follows:
PHASE I. APPLICATION FORM SPPT
first process on hold is usually lasted one day. Checklist application should include:
- Copy of Certificate of Quality Management System SNI 19-9001-2001 (ISO 9001, 2000) which legalized.
- If the imported product should be accompanied by a certificate of origin and the State LSSM have done MRA Mutual Recognition Arrangement with KAN (Committee National Accreditation) PHASE II. VERIFICATION REQUEST LSPro verify include: All requirements for SPPT, reach the location of the audit, the ability to understand the local language (need an interpreter or not). Furthermore, the rising costs will be paid producers. The verification process takes time 1 day. PHASE III. AUDIT QUALITY MANAGEMENT SYSTEM MANUFACTURER - AUDIT ADEQUACY (Document Review). Check the completeness and adequacy of documents Management of the quality system requirements of the manufacturer of the SPPT. If a discrepancy is found, the category should be corrected by the manufacturer within 2 months. - AUDIT suitability. Check the suitability and effectiveness of the quality system implementation Management of dai location manufacturers. If a discrepancy is found, the applicant must make corrections within 2 months. If the correction is not Effectively, then LSPro will conduct a re-audit. The process of this stage is 3 takes 5 days. STAGE IV. SAMPLE TESTING PRODUCTS If necessary sampling for laboratory tests. Applicant warrant officer team of assessors and sampling (PPC) to obtain records and document relating to the Management of the quality system. Instead LSPro warrant officers experts in the field. Tests carried out in the lab testers or institution that has terakreditasi.Di need also witness the time of testing. 4 hold this process takes at least 20 Business Days. PHASE V. ASSESSMENT OF PRODUCT SAMPLES Testing Laboratory Test Results Certificate Issue. If the result does not qualify SNI then the applicant requested to immediately re-test of. PHASE VI. DECISION OF CERTIFICATION All Document audit and test results become Review panel meeting materials SPPT LSPro. The process of preparing the materials normally takes 7 working days. And the panel meeting need one working day. PHASE VII. GIVING SPPT- SNI LSPro clarification of the producers concerned. Clarification needed time 4 Days. The decision granting the certificate by the Review Panel SPPT based on evaluation of products which meet: Completeness Administration (Legal Aspect), the provisions of SNI, Process Management of production and quality systems implemented to ensure consistency of product quality
Sedang diterjemahkan, harap tunggu..
