please can be seen weekly report which is attached below, the problems that need to be done at this time is very quick action is heavy problems with the condition of standby equipments are in dire need of maintenance and repair work in the future.The next issue is to conserve or reduce the use of diesel fuel in the mine area karangbintang it is proposing to do with the manufacture of cable installation between the location of the camp site to post 3 or stock pile area, peralatanyang required are as follows:
Sedang diterjemahkan, harap tunggu..
