2.7. Design PlanningIn response to the philosophy of the implementation of the project by the project team in charge and followed by the project Kick off meetings, the project team will:1. Finalising the detailed staffing plan by setting up "Work Assignment and Schedule Plan". Lead Engineer of compulsory informing of this plan to the EM to get his approval.2. Verify the man-hour required and appoint personnel to form groups of designs from a variety of disciplines.3. Mobilization of a group design discipline4. Check the schedule detailed design and plan5. Check out the list of documents to be used as a reference.6. Setting up the facilities and procedures to ensure consistency in the various fields of engineering.7. Check the scope of work and request the company in order to ensure that the same general understanding was reached by all key personnel. 8. Check the staffing plans and engineering organizations to ensure that the required level of manpower will be mobilized to customize and support information availability schedule and deliverable.
Sedang diterjemahkan, harap tunggu..