please can be seen weekly report which is attached below, the problem is now so critical is the issue of heavy equipments to the standby condition requires treatment and time in the repair work.The next issue is to conserve or reduce the use of diesel fuel in the mine area karangbintang it is proposing to do with the manufacture of cable installation between the location of the camp site to post 3 or stock pile area, the equipment required is as follows: