hamdy sudah tidak bekerja dari minggu yang lalu karena material tidak ada mengenai toilet sudah selesai kecuali sambungan pipa untuk shower tidak saya dapatkan di lombok,
Hamdy was not working from weeks ago because there is no material about the toilet was finished except for the connection pipe to the shower I didn't get in lombok,
hamdy has not worked from a week ago because the material does not exist on the toilet has been completed except for the shower pipe connection is not I got in Lombok,